[ad_1]
The Tamil Nadu Era and Distribution Company (Tangedco) has introduced that energy might be suspended in elements of Chennai at this time for finishing up upkeep work within the metropolis.
Elements of Chennai will face an influence shutdown from 9 am to 2 pm, with provide anticipated to renew earlier than 2 pm if the work is accomplished.
As per a press launch given by the corporate, the next neighbourhoods in Chennai might be affected:
KK Nagar/ Ramaswamy Salai: KK Nagar, MGR Nagar, Ashok Nagar, Kodambkkam, Cholaimedu, Vadapalani, Alwarthirunagar, Virugambakkam, Valasaravakkam, Algirinagar, A part of KK Nagar (1 to 12 sec), Rajamanar Salai, A part of Nesapakkam, Kannigapuram, Vijayaragavapuram, 80 Toes Highway (KK Nagar) and above surrounding areas.
Guindy: RAJBHAVAN AREA Vandikaran st 1 half, Periyar nagar 1 half, Nehru nagar 1 half
St. Thomas Mount: Mariyapuram, Kalaignar nagar, Ganapathy colony, Mangaliamman koil st KOLAPAKKAM AREA: Dharmarjapuram, Girugambakkam
Ramapuram: Kokila Backyard, Valluvar Salai (half), Bazanai koil road, Nedesan nagar T.G NAGAR AREA: A part of Pazhavanthangal, B.V Nagar, PUZHUTHIYAVAKKAM AREA: Medavakkam principal highway, Dhroubhathy amman koil road
Alandur: Cement Highway, Thiruvallurvar road and above surrounding areas.
Taramani/Kottivakkam: 3 rd hyperlink road, 2 nd principal highway, A part of 4 th hyperlink road, Nehru nagar.
[ad_2]
Source link