[ad_1]
Work being carried out in numerous main and minor waterways within the southern components of the town is ready to be accelerated to make sure speedy aid from inundation through the northeast monsoon.
Okay. Phanindra Reddy, Commissioner of Income Administration (CRA), inspected the work being finished in several areas on Wednesday. He instructed the officers of the Water Assets Division (WRD) and numerous different authorities businesses to hurry up the tasks earlier than the subsequent spell of rain.
He inspected numerous water channels, together with Veerangal odai, Madurapakkam odai, Ottiyampakkam surplus course, Thanthikal channel, close to Iyyapanthangal, and Pappan channel at Mudichur service highway.
Mr. Reddy additionally reviewed the monsoon preparedness works at numerous factors of Adyar river, together with close to Kishkinta Highway, Thirumudivakkam bridge and the confluence level of the Chembarambakkam surplus channel. Apart from desilting the susceptible parts of water channels, he additionally instructed officers to be ready with pumping equipment to take away stagnant floodwater in areas corresponding to Semmenchery, Ottiyambakkam and Perumbakkam.
Officers of the WRD famous that the 6-km lengthy Chembarambakkam surplus course and confluence level with Adyar river is being cleared of vegetation to permit free movement of water.
Desilting was additionally being carried out in a number of surplus programs. Mr. Reddy additionally instructed the officers to create non permanent channels to attach waterbodies or rivers wherever there have been lacking hyperlinks.
Most of the long-term flood mitigation tasks within the southern components of the town are in numerous levels of implementation and funds tie-up. Nevertheless, they are going to be taken up after the monsoon. So, non permanent measures are being executed to deal with the northeast monsoon, officers stated.
[ad_2]
Source link