[ad_1]
The Brihanmumbai Municipal Company (BMC)’s standing committee Thursday accredited the price escalation proposal within the building of a bridge close to Kora Kendra in Borivali west. The extension will improve the mission price from Rs 161 crore to Rs 651 crore.
This has elevated the mission price by 300 per cent and prolonged the deadline by two years.
BMC officers mentioned the price improve was because of building of one other bridge on the identical route to attach Hyperlink Highway to Western Specific Freeway in Borivali. In line with the plan, motorists now coming from the Hyperlink Highway will be capable to skip Kora Kendra Junction on SV Highway as they’ll instantly head to the Western Specific Freeway through a set of two flyovers.
The proposal of greater than 300 per cent price escalation was introduced within the standing committee for the third time on Thursday, the place it was handed unopposed. Earlier, all political events had opposed the proposal on the grounds that the price escalation was not justified clearly.
At present, a 970-metre flyover is being constructed between Kora Kendra Junction on SV Highway and Hyperlink Highway. The development started in 2018 however the BMC has now deliberate to increase it as much as the Western Specific Freeway (WEH) to decongest the arterial roads of Borivli.
In the meantime. the BMC mentioned that technical adjustments in building have additionally elevated the price. Civic officers mentioned the rules for load-bearing have been modified, mandating extra security measures to be taken. This has elevated building price.
[ad_2]
Source link